 |
 |
 |
 |
 |

Our Products |
 |
Free Demo Download |
 |
More Open Source |
 |

xTuple ERP 3.0 won the LinuxWorld product excellence award for best Business Application! Read more here!

xTuple has also been recognized as a "Market Leader" by CRM Magazine, for "helping companies streamline business processes, maximize profitability, and provide more value to customers" with the integrated CRM functionality in xTuple ERP.
Our Community |
 |
Industry case studies |
 |
|
 |
To view the Master Production Schedule (MPS), select the "MPS Detail"
option. The following screen will appear:
When viewing the Master Production Schedule, you are presented with
the following options:
- All Warehouses
Select to display MPS detail for all Warehouses.
- Selected
Specify Warehouse whose MPS detail you want to display.
- All Planner Codes
Select to display MPS detail for all Planner Codes.
- Selected
Specify Planner Code whose MPS detail you want to
display.
- Pattern
Enter a Planner Code pattern to select a range of Planner Codes.
Refine your search using Regular Expressions, as described in Section 1.2.9, “Topic: Pattern Matching with Regular Expressions”.
- Calendar
Select the Calendar you want to use for the report. By default,
the Calendar defined at the system level will be used. Associated
Calendar periods will be displayed.
Tip
When setting up a planning Calendar, be sure to include past due
information in the first period of the Calendar.
- Name/Selected Periods
Select as many periods as you want to display. Selected periods
correspond to Calendar specified in the "Calendar" field. Select
individual periods or groups of periods together. To select an
individual period, highlight the period using your mouse button. The
period is now selected. To select a sequence of periods, highlight the
first in the sequence using your mouse button. Then, holding down the
SHIFT key on your keyboard, highlight the last period in the sequence.
The entire sequence is now selected. To select periods that are out of
sequence (e.g., January, April, July, October), highlight the first
period in the group. Then, holding down the CTRL key on your keyboard,
highlight the next period you want to select. Continue highlighting
periods with the CTRL key depressed until all desired periods are
selected. The entire group is now selected.
- Item Sites
Display lists Item Sites for Items matching the specified
parameters. When you have selected a Calendar type and corresponding
Calendar period(s), highlight an Item Site to display MPS detail for
the Item Site in the "MPS Detail" display below.
- MPS Detail
Display lists MPS detail for the Item Site you selected in the
"Item Sites" display above. MPS detail will include the following
rows: Forecast (based on MPS reading of Production Plans); Allocations
(requirements from Customer Orders or Work Orders); Orders (based on
Work Orders or Purchase Orders); Projected Quantity on Hand (based on
Allocations and Orders for specified future periods); Planned Orders
(system-generated Orders showing requirements needed to meet negative
Availability); Availability (based on current Allocations and Orders);
Available to Promise (uncommitted quantity available to support new
Sales Orders).
To the far right of the screen, the following buttons are
available:
- CLOSE
Closes the screen, returning you to the application
desktop.
- PRINT
Runs the report associated with this screen.
Right-clicking on a Line Item in the MPS Detail display enables you to
select from the following context-sensitive options.
-
View Allocations
Select to view Orders the specified Item Site is allocated
to.
-
View Orders
Select to view all the pending Orders for the specified
Item.
-
Export the data displayed on the screen into a plain-text,
TAB-delimited file. This file may subsequently be imported into a
spreadsheet or other office tool.
You will only be able to view Allocations if Allocations are showing a
positive value in the period where you right-click your mouse. Similarly,
you will only be able to view Orders if Orders are showing a positive value
in the period where you right-click your mouse.
If the Line Item is a purchased Item, the following additional options
will be available:
-
Issue P/R
Select to create a Purchase Request for the specified
Item.
-
Issue P/O
Select to create a Purchase Order for the specified
Item.
If the Line Item is a manufactured Item, the following additional
option will be available:
-
Issue W/O
Select to create a Work Order for the specified Item.
 |
 |
 |
 |
Copyright © 1998-2008 by xTuple. All rights reserved.
|
 |