Production Plans are used for loading sales Forecasts into the system. These Forecasts are then accounted for when the Master Production Scheduling (MPS) system is run. Firm Planned Orders may be created for Items listed on Production Plans as the result of an MPS run. To create a new Production Plan, select the NEW button. The following screen will appear: ![]() Create New Production Plan
When creating a new Production Plan you are presented with the following options:
NoteProduction Plans may exist in either of the following two statuses: U = Un-released R = Released The Master Production Scheduling (MPS) system will only consider Production Plans which have been released. Any un-released Production Plans will be ignored by MPS when it is run.
To the far right of the screen, the following buttons are available:
To create a new Production Plan Item, select the NEW button. The following screen will appear: ![]() New Production Plan Item
TipYou can reduce clutter (and simplify) your Production Plans by taking advantage of the Planning Item Type. A Planning Item is an Item whose Bill of Materials (BOM) groups together other Items so that a Production Plan may be defined for the Planning Item—and then exploded down to the lower level Items during a Master Production Scheduling (MPS) run. Planning Items are frequently used to group together product families or product lines of MPS Items. When creating a new Production Plan Item, you are presented with the following options:
To the far right of the screen, the following buttons are available:
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||