2.6.5. Post Standard Costs
Post Standard Costs section.
2.6.5.1.
Update Standard Costs by Item
Standard Costs are the Costs which are recorded in the General Ledger
(G/L) whenever transactions are posted. As such, they are the Costs of
record. Typically, a company will update its Standard Costs on a periodic
basis—for example, annually or quarterly.
If you introduce new products into production between Standard Cost
updates, you may want to roll up existing Standard Costs into the cost of
your new manufactured Items. To update Standard Costs individually by Item,
select the "Update Standard Costs by Item" option. The following screen will
appear:
Note
Updating Standard Costs has absolutely no impact on an Item's Actual
Costs. The only Costs affected will be Standard Costs.
When updating Standard Costs by Item, you are presented with the
following options:
- Item Number
Enter the Item Number of the Item whose Standard Costs you want
to update.
- UOM
Inventory Unit of Measure.
Tip
For manufactured Items, rolling up Standard Costs ensures that lower
level Costs are reflected in the Cost for the parent Item.
-
Roll Up Standard Costs
Select to roll up Standard Costs. When this option is specified,
all selected Costs will be added together to establish a revised total
Standard Cost for the Item. This revised total goes into effect after
the UPDATE button is selected. If all Costs are selected, all Costs
will be rolled up. If a subset of all Costs is selected, only the
subset will be rolled up. If the Roll Up Standard Costs option is not
specified, the selected Cost updates will not be valid above their
current level.
-
Update Lower Level Material Costs
Select to update lower level material Costs. Not selecting means
lower level material Costs will not be included in the Cost
update.
- Update Direct Labor Cost
Select to update direct labor Cost. Not selecting means the
direct labor Cost will not be included in the Cost update.
- Update Lower Level Direct Labor Cost
Select to update lower level direct labor Cost. Not selecting
means the lower level direct labor Cost will not be included in the
Cost update.
Note
You have the flexibility of updating all or only a subset of the
listed Costs. Updating a subset might be desirable if only Material or
User Costs have changed, for example.
- Update Overhead Cost
Select to update overhead Cost. Not selecting means the overhead
Cost will not be included in the Cost update.
- Update Lower Level Overhead Cost
Select to update lower level overhead Cost. Not selecting means
the lower level overhead Cost will not be included in the Cost
update.
- Update Machine Overhead
Select to update machine overhead Cost. This option is selected
by default.
- Update Lower Machine Overhead
Select to update lower level machine overhead Cost. This option
is selected by default.
-
Update User Costs
Select to update user Costs. Not selecting means user Costs will
not be included in the Cost update.
- Update Lower Level User Costs
Select to update lower level user Costs. Not selecting means
lower level user Costs will not be included in the Cost update.
To the far right of the screen, the following buttons are
available:
- CANCEL
Closes the screen without updating selected Costs, returning you
to the application desktop.
- UPDATE
Updates all selected Costs for the specified Item. If the option
"Roll Up Standard Costs" has been selected, the total Standard Cost
for the specified Item will be updated.
- SUBMIT
Select to submit requested action to the Batch Manager for
processing. For additional information, see Section 10.5, “Topic: Submitting Reports and Jobs to the Batch
Manager”.
- SELECT ALL COSTS
Selects all Costs for updating. Use this option to save time
when selecting all Costs for updating. The option "Roll Up Standard
Costs" must be selected separately if you want to include a rolled up
total for the parent Item in the Cost update.
2.6.5.2.
Update Standard Costs by Class Code
In addition to updating Standard Costs individually by Item, you may
also update Standard Costs by Class Code. Updating Standard Costs has
absolutely no impact on an Item's Actual Costs. The only Costs affected will
be Standard Costs. To update Standard Costs by Class Code, select the
"Update Standard Costs by Class Code" option. The following screen will
appear:
Tip
For best performance, you should run this utility by All Class
Codes. This will also ensure your Costs are updated properly for any Items
which cross Class Code lines.
When updating Standard Costs by Class Code, you are presented with the
following options:
- All Class Codes
Select to update Standard Costs for all Class Codes. Running the
utility by all Class Codes is the preferred method.
- Selected
Specify Class Code whose Standard Costs you want to
update.
- Pattern
Enter a Class Code pattern to select a range of Class Codes.
Refine your search using Regular Expressions, as described in Section 1.2.9, “Topic: Pattern Matching with Regular Expressions”.
Tip
For manufactured Items, rolling up Standard Costs ensures that lower
level Costs are reflected in the Cost for the parent Item.
-
Roll Up Standard Costs
Select to roll up Standard Costs. When this option is specified,
all selected Costs will be added together to establish a revised total
Standard Cost for the Item. This revised total goes into effect after
the UPDATE button is selected. If all Costs are selected, all Costs
will be rolled up. If a subset of all Costs is selected, only the
subset will be rolled up. If the Roll Up Standard Costs option is not
specified, the selected Cost updates will not be valid above their
current level.
-
Update Lower Level Material Costs
Select to update lower level material Costs. Not selecting means
lower level material Costs will not be included in the Cost
update.
- Update Direct Labor Cost
Select to update direct labor Cost. Not selecting means the
direct labor Cost will not be included in the Cost update.
- Update Lower Level Direct Labor Cost
Select to update lower level direct labor Cost. Not selecting
means the lower level direct labor Cost will not be included in the
Cost update.
Note
You have the flexibility of updating all or only a subset of the
listed Costs. Updating a subset might be desirable if only Material or
User Costs have changed, for example.
- Update Overhead Cost
Select to update overhead Cost. Not selecting means the overhead
Cost will not be included in the Cost update.
- Update Lower Level Overhead Cost
Select to update lower level overhead Cost. Not selecting means
the lower level overhead Cost will not be included in the Cost
update.
- Update Machine Overhead
Select to update machine overhead Cost. This option is selected
by default.
- Update Lower Machine Overhead
Select to update lower level machine overhead Cost. This option
is selected by default.
-
Update User Costs
Select to update user Costs. Not selecting means user Costs will
not be included in the Cost update.
- Update Lower Level User Costs
Select to update lower level user Costs. Not selecting means
lower level user Costs will not be included in the Cost update.
To the far right of the screen, the following buttons are
available:
- CANCEL
Closes the screen without updating selected Costs, returning you
to the application desktop.
- UPDATE
Updates all selected Costs for the specified Item. If the option
"Roll Up Standard Costs" has been selected, the total Standard Cost
for the specified Item will be updated.
- SUBMIT
Select to submit requested action to the Batch Manager for
processing. For additional information, see Section 10.5, “Topic: Submitting Reports and Jobs to the Batch
Manager”.
- SELECT ALL COSTS
Selects all Costs for updating. Use this option to save time
when selecting all Costs for updating. The option "Roll Up Standard
Costs" must be selected separately if you want to include a rolled up
total for the parent Item in the Cost update.
 |
 |
 |
 |
Copyright © 1998-2008 by xTuple. All rights reserved.
|
 |