2.3.1. Enter New Bill of Materials
To create a new Bill of Materials, select the "Enter New Bill of
Materials" option. The following screen will appear:
When creating a new Bill of Materials, you are presented with the
following options:
- Item Number
Enter the Item Number of the manufactured Item you want to
create a Bill of Materials for.
- UOM
Inventory Unit of Measure.
- Show Expired Components
Select to display expired components in the "Bill of Materials"
display. Expired components are components that have been expired from
the Bill of Materials.
- Show Future Components
Select to display future components in the "Bill of Materials"
display. Future components are components that will be added to the
Bill of Materials at a future point in time.
- Revision
-
If Revision Control is enabled at your site, specify the Bill of
Materials Revision Number you want to view. If none exists, simply
enter a value to create one. The status of the Revision will also be
displayed. The following statuses apply to Revisions:
- Active
-
This is the current Revision. Only one Revision can be
active at the same time. Active Revisions may be modified.
However, once a Revision becomes inactive, it may no longer be
changed.
Tip
The active Revision becomes inactive when a pending
Revision is activated. Inactive Revisions cannot be
modified.
- Pending
This is a Revision that has never been used, but is under
development or consideration. You may store multiple pending
Revisions. When a pending Revision is entered in the "Revision"
field, an ACTIVATE button will dynamically appear to the far
right of the screen. Select the ACTIVATE button to convert a
pending Revision to the active Revision.
- Inactive
This is a formerly active Revision. Inactive Revisions
cannot be modified—only viewed. They are stored to provide
historical, point-in-time build information, which may be used
for various purposes throughout the application. You may store
multiple inactive Revisions.
- Document #
If desired, enter a document number to further identify the Bill
of Materials.
- Revision Date
Indicates the date of the revision.
- Batch Size
Specify the Batch size.
- Bill of Materials
Display lists component Items for the Bill of Materials.
- Pick List Items
Displays the total number of component Items which are also Pick
List Items. Items may be marked as Pick List Items on the Item
master.
- Non-Pick List Items
Displays the total number of component Items which are not Pick
List Items.
- Totals
Displays the total number of component Items.
- Current Std. Material Cost
Displays the current Standard Cost for the component Items. The
displayed Cost includes all Standard Costs associated with the
component Items. Any non-material Costs associated with manufactured
subcomponents (e.g., Labor and Overhead) would also be included in
this total.
- Current Act. Material Cost
Displays the current Actual Cost for the component Items. The
displayed Cost includes all Actual Costs associated with the component
Items. Any non-material Costs associated with manufactured
subcomponents (e.g., Labor and Overhead) would also be included in
this total.
- Maximum Desired Cost
Displays the maximum desired Cost for the component Items. The
maximum desired Cost is defined on the Item master. It provides a
visual guide to help determine whether component Item Costs—either
Standard or Actual—have exceeded the maximum desired Cost.
- Total Qty. Per should equal
Select if you want to require the total Qty. Per units to equal
a certain number. Enter the number you want the total Qty. Per units
to equal. If selected, you will not be able to save the Bill of
Materials until the total Qty. Per requirement is met. To remove the
requirement, simply de-select this option.
To the far right of the screen, the following buttons are
available:
- CANCEL
Closes the screen, returning you to the application
desktop.
- SAVE
Saves the new Bill of Materials to the master list of Bills of
Materials. Mac users may use COMMAND + S to save.
- ACTIVATE
-
Select to activate a pending Revision. This button will only be
visible when a pending Revision number is entered in the "Revision"
field.
Tip
When you activate a pending Revision, the currently active
Revision will become inactive. Inactive Revisions cannot be
modified.
- PRINT
Runs the report associated with this screen.
- NEW
Opens screen for creating a new component Item.
- EDIT
Enables you to edit highlighted components. The edit screen is
the same as that for creating a new component—except that when
editing, the fields will contain component information.
Double-clicking on a component will also bring you to the editing
screen.
- VIEW
Highlight a component and then select this button to reach a
read-only view of the "Edit" screen.
- EXPIRE
Highlight a component and then select this button to expire the
Item from the Bill of Materials.
- MOVE UP
Highlight a component Item and then select this button to move
the component up the Bill of Materials list. Sequence numbers are
automatically adjusted to reflect the change in position.
- MOVE DOWN
Highlight a component Item and then select this button to move
the component down the Bill of Materials list. Sequence numbers are
automatically adjusted to reflect the change in position.
Right-clicking on an Item in the Bill of Materials Item list enables
you to select from the following menu options:
- View
Highlight a component and then select this button to reach a
read-only view of the "Edit" screen.
- Edit
Enables you to edit highlighted components. The edit screen is
the same as that for creating a new component—except that when
editing, the fields will contain component information.
Double-clicking on a component will also bring you to the editing
screen.
- Expire
Highlight a component and then select this button to expire the
Item from the Bill of Materials.
-
Replace
Select to replace the specified component with another
Item.
- Move Up
Highlight a component Item and then select this button to move
the component up the Bill of Materials list. Sequence numbers are
automatically adjusted to reflect the change in position.
- Move Down
Highlight a component Item and then select this button to move
the component down the Bill of Materials list. Sequence numbers are
automatically adjusted to reflect the change in position.
-
Export the data displayed on the screen into a plain-text,
TAB-delimited file. This file may subsequently be imported into a
spreadsheet or other office tool.
2.3.1.1. Bill of Materials Item
To add new components to a Bill of Materials, select the NEW button.
The following screen will appear:
Tip
Bill of Materials component Items must have an Item Site defined to
be valid.
When adding a new component Item to a Bill of Materials, you are
presented with the following options:
- Item Number
Enter the Item Number of the Item you want to add to the Bill of
Materials.
- UOM
Inventory Unit of Measure.
- Effectivity
-
Specify the component's effectivity, using the following
parameters:
- Effective
The system enables you to specify when a component can be
used in a Bill of Materials. For example, the company's
engineering department may be working on a new design for an
existing Item—but that new design will not be available
for use until a given date in the future. In this case, you can
specify a future "effective" date to indicate when the component
will be available for use.
- Expires
The system also enables you to specify when a component is
planned to be obsoleted from (i.e., no longer used in) a Bill of
Materials. As mentioned above, the company's engineering
department may be working on a new design for an existing
Item—but that new design will not be available for use
until a given date in the future. In this case, the old
component Item must be marked for "expiration" on the date when
the new Item becomes effective. Setting this parameter will
instruct the system to stop using the specified component on the
date entered into this field.
- Qty. Per
Per: Specify the quantity of the component Item required per
Bill of Materials. This is a required field.
- Issue UOM
Specify the Unit of Measure (UOM) you want to use when issuing
Item quantity to Work Orders. Unless you specify an alternate UOM, the
Inventory UOM will be used by default.
- Scrap %
Number entered should represent a percentage of material
quantity that is additionally consumed as Scrap. This is a required
field.
Tip
Using the "Create Child W/O at Parent W/O Explosion" option can
greatly simplify the processing of Work Orders. If this option is not
selected, child Work Orders will need to be created independently.
- Create Child W/O at Parent W/O Explosion
Select to create Work Orders for manufactured components when
their parent Items are exploded. This option applies only to
manufactured Items appearing as components on a Bill of Materials. If
selected, a Work Order will automatically be created for the
manufactured component when the parent Item is exploded. The impact on
Work Order numbers will be visible. For example, a "-1" will be
appended to the parent level Work Order and a "-2" to the child level
Work Order—as in, #1061-1 and #1061-2. If this option is not
selected, a child Work Order will not be created when the parent Item
is exploded.
Note
The "Create Child W/O at Parent W/O Explosion" option will cause the
creation of lower level Work Orders BOTH at Work Order explosion and also
during the explosion that takes place during Master Production Scheduling
(MPS) and Material Requirements Planning (MRP) runs.
- Issue Method
-
Method: Select one of the available issue methods:
- Push
Select if you want the component Item to be issued to Work
Orders by a specific material issue transaction. Because a
specific material issue transaction must be used, "Push" Items
enable you to monitor material usage variances. Standard issue
quantities are not automatically backflushed to Work Orders, as
is true for "Pull" Items. If a component Item uses the "Push"
issue method, you must manually issue quantities to Work
Orders.
- Pull
Select if you want the component Item to be issued to Work
Orders by a material backflush. "Pull" Items are automatically
issued to Work Orders when Work Order Production is posted.
Using the "Pull" issue method saves time, since materials do not
need to be manually issued to Work Orders by a specific material
issue transaction.
- Mixed
Select if you want the component Item to take upon itself
the issue method applied to it initially—that is, either
"Pull" or "Push." Assigning the "Mixed" issue method to a
component Item gives you the flexibility of deciding on a
Work-Order-by-Work-Order basis whether you want to assign the
"Pull" or "Push" method to the component Item.
Note
You can define a default issue method for new Bill of Materials
component Items at the system level.
- Used At
Specify which Operation the component is used at. Using the
browse button located to the right of the field, select a Bill of
Operations sequence number to identify which Operation the component
is used at. Linking a component with an Operation will have certain
effects. First, when posting Operations, components that are linked to
a given Operation will be backflushed if the issue method for the
components is either "Pull" or "Mixed" and the Operation is set to
Auto Issue components. Secondly, Work Order paperwork, such as
Routings, will show the relationship between linked Work Order
Material Requirements and Work Order Operations.
Tip
If an Operation happens to have been expired on the current day, the
Operation will still appear as an option when selecting "Used At"
Operations. Once a day passes, however, the expired Operation will no
longer appear as a "Used At" option on the BOM.
- Schedule w/ W/O Operation
Select to indicate that this component is not due until the Work
Order Operation that will consume it is scheduled to begin. The
scheduling of Operations is handled by the Execution Day indicator on
the Bill of Operations item screen. For example, let's say we have an
Operation with an Execution Day = 5. This means the Operation is
scheduled to begin five days after the start date of the Work Order.
Components scheduled with this Operation are due the day before the
Operation starts—that is, on day four after the Work Order start
date—to ensure they will be available when the Operation is
scheduled to begin. If this option is not selected, then the component
scheduling will be governed by the start and due dates set on the Work
Order header.
- ECN #
Enter the Engineering Change Notice Number—if
applicable—for the specified component Item.
Note
BOM-defined Substitutions are the only Substitutes which may be
implemented during Work Order processing. To substitute a component Item
on a Work Order, use the "Substitute" option found on the right-click menu
of the Maintain Work Order Material Requirements screen.
- Substitutions
-
Choose one of the following Item Substitution options:
- No Substitutions
Select if no Substitutions exist for the component
Item.
- Item-Defined Substitutions
Select if Substitutions are defined on the Item master for
the component Item. Selecting this option will not cause
Item-defined Substitutions to display here. You are simply
indicating that Item master level Substitutions do exist.
- BOM-Defined Substitutions
Select to define Item Substitutions at the Bill of
Materials level.
Tip
To ensure Availability, a BOM-defined Substitution must be located
in the same Warehouse as the component Item it replaces. If the Substitute
is located in a different Warehouse, it will not be available for
substitution.
To the far right of the screen, the following buttons are
available:
- CANCEL
Closes the screen without inserting the component Item into the
Bill of Materials, returning you to the previous screen.
- SAVE
Inserts the component Item into the Bill of Materials,
automatically assigning it a sequence number.
- NEW
Opens screen for creating a new BOM-defined Substitution.
- EDIT
Enables you to edit a BOM-defined Substitution. Highlight the
Item Substitute you want to edit and then hit the EDIT button—or
double-click on the Item Substitute to enter the edit mode. The edit
screen is the same as that for creating a new Item
Substitute—except that when editing, the fields will contain
existing information.
- DELETE
Highlight an Item Substitute and then select this button to
remove the Item Substitute from the list.
To create a new BOM-defined Substitution, select the NEW
button. The following screen will appear:
When adding a new BOM-defined Substitution, you are presented with the
following options:
- Item Number (Root Item)
Displays Item Number of specified component Item.
- UOM
Inventory Unit of Measure.
- Item Number (Substitution)
Enter the Item Number of the Substitute Item.
- UOM
Inventory Unit of Measure.
- Substitute/Parent UOM Ratio
Indicate the ratio between the Issue UOM for the specified BOM
Item and the corresponding Issue UOM for the Substitute Item.
- Ranking
Select a number using the arrow buttons, or manually enter a
value up to a maximum of 9. Enter the specified ranking order of the
Item Substitute. You may assign the same ranking to multiple Items, if
this is appropriate.
To the far right of the screen, the following buttons are
available:
- CLOSE
Closes the screen, returning you to the previous screen.
- SAVE
Inserts the Item Substitution into the list of BOM-defined
Substitutions.
To add Comments to a component Item, select the "Comments" tab at the
bottom of the "Bill of Materials Item" screen. The following screen will
appear:
- Comments
Display lists the date Comment entered, Comment Type, user who
entered Comment, and a content preview.
To the far right of the screen, the following buttons are
available:
- NEW
Opens screen for creating a new Comment.
- VIEW
Highlight a Comment and then select this button to reach a
read-only view of the Comment.
To create a new Comment, select the NEW button. The following screen
will appear:
- Comment Type
-
Specify one of the following Comment Types from the drop-down
list: ChangeLog or General.
Comment Types are used to categorize Comments. Once you have
specified a Comment Type, you may type your Comment in the main text
area. The text area features word-wrapping and scroll-bar support for
longer Comments.
To the far right of the screen, the following buttons are
available:
- CANCEL
Closes the screen without creating the Comment, returning you to
the previous screen.
- SAVE
Creates the Comment and adds it to the list of Comments.
To link a Bill of Materials component to a Bill of Operations
Item, select the browse button located to the right of the "Used At" field.
The following screen will appear:
When linking Bill of Materials components to Bill of Operations Items,
you are presented with the following options:
- Item Number
The component Item selected on the Bill of Materials screen will
display here.
- UOM
Inventory Unit of Measure.
- Bill of Operation Items
Display lists Bill of Operations Items for the same manufactured
Item whose Bill of Materials is being specified. Highlight the
Operation you want to link the Bill of Materials Item to, then hit the
SELECT button.
To the far right of the screen, the following buttons are
available:
- CANCEL
Closes the screen without linking the Bill of Materials
component to a Bill of Operations Item, returning you to the
application desktop.
- CLEAR
Removes the link between a Bill of Materials component and a
Bill of Operations Item if such a link has been made.
- SELECT
Links the Bill of Operations Item to the specified Bill of
Materials component. Highlight the desired Bill of Operations Item
before selecting the SELECT button.
 |
 |
 |